Our CPU in the heart of Erfurt, the capital of Thuringia, was set up by us as early as in 2004. Since then we have continuously invested in maintenance and technical equipment depending on the needs of our clients and our own vision. The general set-up of the site is based on a modular system with highly flexible possibilities of adaptation to the respective phase-I or phase-II study design.